My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30617
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:07 PM
Creation date
11/23/2007 6:45:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/22/1981
Doc Name
Review of stips
From
MLR
To
FILE NO C-007-80
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-10- <br />COMPLETED, AND THE RESULTS SUBMITTED TO THE DIVISION FOR REVIEW. NO PILLAR <br />RECOVERY SHALL OCCUR WITHIN THE AFFECTED PANELS PRIOR TO RECEIPT OF DIVISION <br />APPROVAL. IF SUBSIDENCE MONITORING EXPERIENCE OR THE DETAILED STABILITY <br />ANALYSIS INDICATE THE SECONDARY EXTRACTION WOULD ADVERSELY AFFECT THE STABILITY <br />OF THE LANDSLIDE DEPOSIT ABOVE THE TOWN OF SOMERSET, THEN ARCO SHALL LIMIT <br />EXTRACTION OF THESE PANELS TD 50$. THE AFFECTED PANELS ARE THE THREE NORTHERN- <br />MOST PANELS TO THE WEST OF THE MAINS WITHIN SECTION 17. <br />MLRD Findings Document: Stipulation No. 43, p. 47 <br />OSM Findings Document: Stipulation No. 41, p. 11 <br />OSM TEA: This stipulation has not been included in the TEA. <br />28. Stipulation: THE DIVISION DIRECTS ARCO COAL, AS A R9RTION OF ITS SUBSEQUENT <br />PERMIT APPLICATIONS FOR THE MT. GUNNISON NO. 1 MINE, TO SUBMIT A REVISED <br />SUBSIDENCE EVALUATION. THE SUBSIDENCE EVALUATION FOR THE NEXT PERMIT PERIOD <br />SHALL INCORPORATE THE RESULTS OF SUBSIDENCE MONITORING AND THE LANDSLIDES <br />STABILITY STUDIES STIPULATED ABOVE IN THE DESIGNATING REFINED "SAFE AREAS" <br />BUFFER BOUNDARIES TO BE OBSERVED IN FUTURE MINING BENEATH CRITICAL AREAS, <br />INCLUDING THE DRY FORK OF MINNESOTA CREEK, BEAVER RESERVOIR AND THE LAND- <br />SLIDE DEPOSITS ADJOINING IT. THE AMENDED SUBSIDENCE EVALUATION SHALL INCLUDE <br />THE PROPOSAL OF APPROPRIATE SUBSIDENCE MONITORING NETWORKS WITHIN EACH OF <br />THESE CRITICAL AREAS. <br />MLRD Findings Document: Stipulation No. 44, p. 47 <br />OSM Findings Document: Stipulation No. 42, p. 11 <br />OSM TEA: This stipulation has not been included in the TER. <br />29. Stipulation: THE APPLICANT SHALL INSTALL AND MONITOR THE 2 PROPOSED MONITORING <br />WELLS WHICH WILL BE LOCATED BELOW THE INITIAL WASTE ROCK PILE PRIOR TO CON- <br />r <br />STRUCTION THE PILE. THE APPLICANT SHALL SUBMIT TO THE REGULATORY AUTHORITY <br />~~,j,"•, WELL COMPLETION REPORTS, AND GROUND WATER LEVEL QUALITY DATA PRIOR TO PLACING <br />ti WASTE ROCK IN THE PILE. <br />~ ~~ <br />(.% ~~ MLRD Findings Document: Stipulation No. 21, p. 18 <br />. <br />OSM Findings Document: Stipulation No. 12, p. 6 <br />OSM TEA: Stipulation No. 8, p. 31 <br />30. Stipulation: ARCO COAL MUST RERUN CHEMICAL ANALYSES OF F-SEAM ROOF, FLOOR, <br />INTERBURDEN AND COAL FROM THE ORIGINAL CORES ANALYZED ( SOM-2, SOM-6, SOM-38, <br />SOM-S0, SOM-59, SOM-65, RND MG-9) OR FROM 6 ALTERNATE CORES REPRESENTATIVE OF <br />THE MINE PLAN AREA. THE ANALYSES ARE TO BE RUN FOR THOSE PARAMETERS REQUIRED <br />BY THE DIVISION AND TO BE RUN BY THE METHODS LISTED ON ATTACHED APPENDIX A, <br />BASELINE OVERBURDEN CHEMICAL-MINERAL ANALYSIS. THESE ANALYSES SHALL BE SUB- <br />MITTED TO THE DIVISION WITHIN 6 MONTHS OF THE PERMIT ISSUING, AND SHALL BE <br />~ REPORTED AS INCLUSIONS TO THE PERMIT APPLICATION. <br />,~ MLRD Findings Document: Stipulation No. 1, p. 2 <br />~~~lll OSM Findings Document: Stipulation No. 32, p. 9 <br />~.~~ <br />OSM TEA: Stipulation No. 7, p. 30 as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.