My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV106801
DRMS
>
Back File Migration
>
Revision
>
REV106801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:21:26 AM
Creation date
11/22/2007 1:37:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
10/11/2001
Doc Name
ADEQUACY REVIEW PR-06 UNIT TRAIN LOADOUT & INCREASE IN PRODUCTION BOWIE 2 MINE PN C-96-083 BOWIE RES
From
DMG
To
BOWIE RESOURCES LIMITED
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flow of 0.82 cfs from ditch H2. This appeazs to be a typographical error. Please revise, if <br />appropriate. <br />31. It is not apparent on the proposed maps how flow from ditch D-F3 gets across Old State <br />Highway 133 to ditch D-H1. If there is a road culvert involved, please revise the <br />appropriate maps. <br />32. On proposed page Exh-8-31, it is stated that culvert C-i3 receives flow only from ditch D- <br />i7. However, the Division believes there is an irrigation ditch that flows down the east <br />side of the Terror Creek Loadout and into culvert C-i3. Also, it appears that discharge <br />from the east sediment pond at the Terror Creek Loadout would also flow through culvert <br />C-i3, although this pond is nearly always dry. Please revise the hydrology design for <br />culvert C-i3, if appropriate. <br />33. Please add the annotations for ditches J 1 and ]2 on Map 20 and Map 21-3. <br />34. On proposed page Exh-8-179, in the table for ditch J 1, the time of concentration is shown <br />as being 4 hours. Please revise. <br />35. On proposed Map No. 22-J, "Pond J Detail", please change the annotation for the culvert <br />that goes into Pond J from C-J 1 to C-J3. <br />36. On proposed Map No. 22-J, "Pond J Detail", in Section B-B' and in "Section C-C', some <br />of the pond detail elevations do not match up with the side scale elevations. For instance, <br />the "top of embankment" elevation of 5828 feet is at the side scale elevation line of 5830 <br />on Section B-B' and above the side scale elevation line of 5829 on Section C-C'. Please <br />revise. <br />37. On proposed Map No. 21-1 and Map No. 20, there is a ditch and a culvert near the <br />bottom of the conveyor corridor that do not have annotations. They aze just downgradient <br />of ditch D-B25. Please revise both maps. <br />38. On proposed Map No. 21-2 and Map No. 20, there is a ditch that goes out of culvert C- <br />C11 and a ditch that goes out of culvert C-C 12, both on the facilities bench, that aze not <br />annotated. Please revise. <br />39. On proposed Map 09, "Hydrologic Monitoring Location Map", please add the permit <br />boundary to the insert map.0 <br />40. Please change the title on Map No. 21-2, Sheet 2 of 4, from "Mine Facilities" to <br />"Drainage Plans." <br />4l. The ditch design for D-B26 is presented on proposed page Exh-8-SSi. The ditch design <br />
The URL can be used to link to this page
Your browser does not support the video tag.