Laserfiche WebLink
The layout shall be adequate for use as a construction plan and shall include <br />dimensions, details, etc. Any proposed variance or deviation from these <br />documents shall be submitted to MANAGER in writing a minimum of seven (7) <br />Working days prior to the scheduled start of geomembrane installation and will <br />be acceptedlrejected by MANAGER prior to start of installation. <br />9. A list of personnel performing field seaming operations along with pertinent <br />experience information. <br />10. All geosynthetic Quality Control Certificates required by [here <br />SPECIFICATIONS. <br />11. Certification that extrudate to be used is comprised of the same resin as the <br />geomembrane to be used. <br />C. Submittals By CONTRACTOR to MANAGEA during the course of the work. <br />1. Daily reports detailing arrival and departure times, the personnel present on-site, <br />the progress of the Work, the arrival of materials, and any problems <br />encountered. <br />2. Subgrade surface acceptance certificates for each area to be covered by the <br />lining system, signed by CONTRACTOR. <br />D. Without limiting the provisions of [he Contract, the CONTRACTOR shall warrant the <br />Work to MANAGER in accordance with the following: <br />1 . The geomembrane supplied is suitable for the environmental conditions at [he <br />site and the service conditions as described ire this SPECIFICATION. <br />2. The geomembrane supplied mee[s or exceeds all published SPECIFICATIONS <br />as referenced by the SPECIFICATION. <br />3. The geomembrane are free of defects in materials and workmanship. <br />4. The CONTRACTOR shall repair ar replace all defects in the material detected <br />on-site, including uncovering and recovering the work, in compliance with the <br />SPECIFICATIONS. <br />5. The CONTRACTOR shall repair any detected leaks in any seams (Manufactured <br />or field jainedl, inducting uncovering and recovering the work, in compliance <br />with the SPECIFICATIONS. <br />1.03 QUALITY ASSURANCE: <br />A. Manufacturing Qualifications <br />1. The MANUFACTURER(si shall have experience in the manufacture of the type <br />of geomembrane that is being installed at the Cresson Project totaling at least <br />five completed facilities totalling a minimum of 5,000,000 square feet. <br />2. The MANUFACTURER shall provide sufficient production and qualified <br />personnel to meet the demands of the work and shall have an internal quality <br />March 28, 199f! Seetion 02776.0 <br />02776.0-3 Geomembrane <br />Revision 4 <br />