Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd Sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />N/A <br />________________________________________________________________________ <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ Cost (E) <br />N/A <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ <br />________I_ Task Description ~ <br />_________________________________________________I_ Cost (E) <br />___________ <br />6 ~ DemolitionDispose of 5'x5'x10' mass a 50.22/t.f. ~ 555 <br />7 ~ Seeding As per attached worksheet. ~ E7, 266 <br /> Fencing N/A <br />8 ~ Mob/Demob As per attached worksheet. ~ 5930 <br /> Subtotal (M): E8, 271 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 518,694 <br />II. INDIRECT COSTS <br />_____________________________________________________________ <br />___________ <br />_____________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT ___________ <br />Item No.~ Item Description ~ Cost (E) <br />________I_ <br />1. ~ _________________________________________________I_ <br />PubLic Liability Insurance.... 1.SSOX of dir. ~ __.,________ <br />5290 <br />2. ~ Contractor's Performance Bond 0.975X of dir. ~ 5182 <br />3. ~ Contractor's -rof it........... 10.OOX of dir. ~ E1, 869 <br />4. ~ Job Superintendent.. <br />Subtotal (A): 52,341 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 521,036 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />1. ~ Minerals Program Adm S.OOX of cnt r.l 81,052 <br />NET INDIRECT COST PERCENTAGE: 18.15X Subtotal (B): E1, 052 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 53,393 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 522,088 <br />