Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - SCRAPER YORK <br />TASK N0. 5 PREP. BY: SSS PERMIT N0. M-77-020 <br />_____-____ _____--- ---__---__ <br />DATE 11/17/97 FILENAME: M020-5 MINE: Pit No. 1 <br />__-______- _____--- ------------- <br />PERMIT ACTION :Amendment No. 1 Recalculation <br />TASK DESCRIPTION Replace topsoil on disturbed areas of site <br />HOURLY EOUI PMENT COSTS: <br />______________________ Single, Double or Triple <br />County:DE LTA Labor Zone 1 Shifts :S <br />Equipment Descriptions <br />Scraper team make-up CAT 633E with ROPS cab <br />Road mainT. - Grader N/A <br />- Water T.: N/A <br />Scraper Team <br />Scraper Dozers) <br />Equipment Filename:633E-ROP 0 <br />Utilization on job: 100% N/A <br />________ ________ <br />Cost Breakdown: <br />Ownership cost/hr: 568.01 N/A <br />Operating cost/hr: 598.94 N/A <br />Operator cost/hr: 523.13 N/A <br />Unit subtotals: 5190.09 N/A <br />_______ <br />________ <br />Scraper team subtotal _ <br />5190.09 <br />Total Nork Team Cost/Hr: 519D.09 <br />Road Maintenance <br />Grader Water truck <br />N/A N/A <br />------- --------- <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />--------- --------- <br />Maint. subtotal N/A <br />MATERIAL <br />_________ QUANTITIES: <br />__________ <br />_________ <br />Beg. __________ <br />Volume: 3915 LCY <br />Cu. Yd. ---------- Swell Loose <br />Volume: 3,915 LCY Factor: N/A Volume: 3,915 LCY <br />Source of quantity take off: Assume 4.16 acres <br />__________________ requiring topsoil replacement <br />_________________________ <br />Source of est. swell factor: N/A <br />