Laserfiche WebLink
<br /> <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RELONSTRUCT]ON <br />Task No.l Task Description I Cost (E) <br />-------- I -------------------------------------------------- I ---------- <br />I N/A I <br />I I <br />I I <br />I i <br />Subtotal (H): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTgLLATION/REMOVAL- <br />Task No.l Task Description I Cost (E) <br />I N/A <br />I <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description I Cost (E) <br />5 I Repi ace 7 in. depth of topsoil on Disturbed areas) E7, 224 <br />I of the East Pa rceL except below water level, on I <br />I roads and where sight berm is located. I <br />~ 4.16 ac. x .SSft = 3,915 c.y. I <br />Subtotal (J): E1,224 <br />