Laserfiche WebLink
<br />Mr. James Dillie <br />Adequacy Letter, Apache Mine Permit No. M78-009 <br />Page 11 <br />RECLAMATION COSTS <br />EXHIBIT L <br />Reclamation costs are estimated assuming that (1) the greatest area of disturbance <br />that will exist during the life of the mine is ~@ 85 acres, (2) no more than 35 40 acres will <br />need to be backfilled and resoiled, (3) no more than 35,696 26,000 cubic yazds of topsoil <br />will need to be spread, (4) nor more than 30,000 cubic yards of overburden will need to <br />be backfilled, and (5} no more than ~6 65 acres will need to be reseeded. <br />Estimated costs for reclamation items aze outlined below: <br />1. Grass seed mix ~-^~~6 <br />Z. Fertilizer (assumed; actual will depend on soil <br />analysis) nitrogen-phosphate (18-46-0) tae <br />3. Backfilling -with dozer, push 200" ----9~3S~ey <br />4. Respreading soil and/or growth media with <br />scraper, haul 500' ---~9-39fey <br />5. Seed mixture drilling, fertilizing and labor, <br />1~leg $65/ac -Afee <br />6. Labor, other: 16 man hrs/ac @ $539F4~ $ 11.50/hr--164-9Ajsc <br />Reclamation Costs <br />c"c~,... .. cn ....~,.,, m , ~cn nn <br />Grass, $145/ac x 65 acres m--~ <br />Fertilizer, $25.00/ac x 65 acres 486~A <br />Backfill : 30,000 cy @ $0.31/yd ~J=;460.89 <br />Haul distance - 500'/40 ac/8" (26,000 cy @ 0.63) <br />Seed mixture drilling, fertilizing and labor 4;~66~69 <br />Labor, other, `~-ae~T,--'.-04;~ 65 ac a $184/ac 369-98 <br />Subtotal $4§56;66 <br />Misc. contingency 10% <br />Mobilization -Demobilization <br />Total "^ `~~~ <br />$ 145.00/ac <br />25.00/ac <br />0.31/cy <br />0.63/cy <br />65.00/ac <br />184.00/ac <br />$ 9,425.00 <br />1,625.00 <br />9,300.00 <br />16,380.00 <br />4,225.00 <br />11,960.00 <br />$ 52,915.00 <br />5,290.00 <br />2,000.00 <br />$ 60,205.00 <br />RECOMMEND BOND BE SET AT X43-868 $60,000 <br />