Laserfiche WebLink
<br />The listed qualified individual(s) will prepare, supervise and implement a <br />Remediation and Disposal Plan conducted in accordance with the requirements <br />of the governing regulatory agencies. <br />TOPSOIL REPLACEMENT -Topsoil replacement will occur with mobile equipment once <br />all re-grading of an area disturbed by mining is complete. Topsoil will be replaced to a <br />thickness of at least 6 inches, which is appropriate to establish vegetation communities <br />consistent with the post mine land use. Topsoil will be segregated from the imported <br />material that is brought to the site, and from the existing previously mentioned seeded <br />visual berms. It is estimated that a total of 37,000 cubic yards of topsoil will be required <br />over all of the disturbed areas. Topsoil will be obtained from the existing visual berms. <br />REVEGETATION -The intent of the re-vegetation is the establishment of plant <br />communities consistent with the post-mine land use. After topsoil replacement, seed bed <br />preparation and stabilization will be conducted and may include one of the following: <br />ripping, disking, harrowing and furrowing. Continuous analysis of re-vegetation success <br />will determine the best type of preparation that should be used. <br />The seed mixture was selected to vegetate the disturbed areas with a specie consistent <br />with the post mine land use. Seeding recommendations are on the following page. <br />Rev.01-04-00 <br />E-10 <br />