Laserfiche WebLink
The application is in compliance with this rule. See Tabs 17 and 20. <br />Rule 2.05.4(2)(e)(ii) Species and amounts per acre of seeds and seedlings to be used; <br />The application is in compliance with this rule. See pages 4 and 5 at Tab 20. <br />Rule 2.05.4(2)(e)(iii) Methods to be used in planting and seeding; <br />The application is in compliance with this rule. Drill seeding is the preferred method. See page 6 <br />Tab 20. <br />Rule 2.05.4(2)(e)(iv) Mulching techniques; <br />The application is in compliance with this rule. A cover crop is used in lieu of mulching for drill <br />seeding. A mulch is proposed in areas, if any, hydroseeded. See page 6 Tab 20. <br />Rule 2.05.4(2)(e)(v) Irrigation, if appropriate and pest and disease control measures, if any; <br />The application is in compliance with this rule. Irrigation is not proposed. Weed and pest control <br />is described, beginning on page 6 <br />Rule 2.05.4(2)(e)(vi) Measures proposed to be used to determine the success of revegetation in <br />accordance with 4.15.7; and <br />The application is in compliance with this rule. See entry starting on page 9 Tab 20. <br />Rule 2.05.4(2)(e)(vii) Soil testing plan for evaluation of the results of topsoil handling and <br />reclamation procedures related to revegetation and topsoil standards of 4.06. <br />The application is in compliance with this rule. Topsoil was tested. See Attachment 9-4. <br />Rule 2.05.4(2)(f) A description of measures to be employed to ensure that all debris, <br />acid forming and toxic forming materials constituting a fire hazard are disposed of in <br />accordance with 4.11.4 and 4.14.3 and a description of the contingency plans which have been <br />developed to preclude sustained combustion of such materials; <br />The application is in compliance with this rule. Salvage is part (page 3 Tab17, page 2 Tab 18). <br />Some concrete is to be used in backfill (page 2 Tab 18, page 3 Tab 23). Gravel railroad ballast <br />will be used as backfill (page 4 Tab 23). Coal fines are to be covered (page 2 Tab 18),off--site <br />disposal is part (page 2 Tab 18). <br />Page 21 of 38 pages, November 8, 2005 <br />