Laserfiche WebLink
found for the reclamation of the water supply line (page 3 of Tab 17). Surface water control <br />structures are to be removed (page 2 Tab 16). The revegetation plan is at Tab 20. A reclamation <br />schedule is at Tab 17, and backfilling and grading at Tab 18. The reclamation post-reclamation <br />contour map is at Exhibit 18-1. Exhibit 17-1 does not indicate disturbance associated with the <br />water supply line. <br />Rule 2.05.4(2) Each plan shall contain the following information for the proposed permit area, <br />including any roads which are to be removed, or modified for retention as part of the <br />post-mining land use.• <br />Rule 2.05.4(2)(x) A detailed timetable for the completion of each major step in the reclamation <br />plan; <br />The application is in compliance with this rule. See Tab 17. <br />Rule 2.05.4(2)(b) A detailed estimate of the cost of reclamation of the proposed operations <br />required to be covered by a performance bond with supporting calculations for the estimates; <br />The application is in compliance with this rule. Tab 23 includes a cost estimate. An estimate, <br />reconciled with the Division estimate, is at Attachment 23-1. The one in the PAP is for Permit <br />Renewal 2. It needs to be replaced by the estimate of TR-06. <br />Rule 2.05.4(2)(c) A plan for bac~lling, soil stabilizing, compacting, and grading with <br />postmining contour maps and appropriate cross sections that are typical and representative of <br />the anticipated character of the final surface configuration of the proposed permit area, in <br />accordance with 4.14, for stream channel reconstruction in accordance with 4.05.4, and for road <br />removal or modification in accordance with 4.03. <br />The application is in compliance with this rule. See Tab 18. See Exhibit 18-1 for post-mining <br />topography. See Exhibit 18-2 for post-mining topography cross-sections. <br />Rule 2.05.4(2)(d} A plan for removal, storage and redistribution of topsoil, subsoil, and other <br />material to meet the requirements of 4.06. <br />The application is in compliance with this rule. See Tab 19. Removal is at page 3. Storage starts <br />on page 3. Redistribution starts on page 7. <br />Rule 2.05.4(2)(e) A plan for revegetation to meet the requirements of 4.15, including, but not <br />limited to, description of the: <br />The application includes a plan. <br />Rule 2.05.4(2)(e)(i) Schedule of revegetation; <br />Page 20 of 38 pages, November 8, 2005 <br />