My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104616
DRMS
>
Back File Migration
>
Revision
>
REV104616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:58 AM
Creation date
11/22/2007 1:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
2/26/2003
Doc Name
Adequacy Review & Cost Summary Form
From
DMG
To
Montgomery Watson Harza
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IOENTIFlCATION <br />Agency or organization name: Cobratlo Division Oi Minerals Antl Geology <br />Task X: 046 State: Colorado PermiVOb X: P92.081 <br />Date: 011262003 County: Routt Abbreviation:nare <br />User- JRS Si[e: Hayden Gulch LOadout Filename: C081-046 <br />Permit or other job action: Permif Renewal d2 <br />Task description : Mobtlize/Demabilize Equipment for Pontl Femoval <br />Shia basis: t <br />Cost data source: C <br />Truck tractor tlescdption: <br />Truck trailer Description <br />E EQUIPMEM <br />Machine <br />Descrption WeghWnit <br />(Ions) Ownership <br />CosVbr/unit Haul Rig <br />Cosl/nr/unit Fleet Siie <br />(NO. units) Haul Trip <br />CasMrtlleat Return Trip <br />Costlhr/fleet DOT permit <br />CosNleet <br />-Cat 09R-9SU fiS96 553.66 $11B.2B 1 $171.94 $118.28 50.00 <br />-Reveg Equipment 20.00 566.00 $]9.90 f $145.90 57990 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5317.84 4198.78 50.00 <br />ROAOABLE EQUIPMENT <br />Machine <br />Description Total <br />osMour/unil Fleel Size <br />(NO. units) Haul Trip <br />CosVhr/llaet Return Trip <br />Cosbhrfllaet <br />-Flatbed Truer, 6x1, dSKGIM/ $90.64 / 890.64 $90.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 590.64 590.64 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest mal or city or town within project area region : Crsig <br />Transoonafon Cwle Time: Nom Total qne-way travel distance: 400 miles <br /> Roatlable Roadable Avaroga tmvel speetl: 40.0 mph <br /> Equipment Equipment <br />Haul time (hours)= 1.00 1.00 Total non-roadable mob/damob cost -: $1,667J0 <br />RBWm time (hours)= 1.00 1.00 -Nro muM trye with luW ng <br />LOadlog time (hours)= 0.50 NA Total readable mob/demob cost -': $tet28 <br />Unloatling time (hours)= 0.50 NA one mmdtrip.rolaW n9 <br />Subtotals= 300 2.00 <br />JOB TIME ANO COST Total lob time: 6.00 hours <br /> Total lob cost (1,849 <br />
The URL can be used to link to this page
Your browser does not support the video tag.