Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IOENTIFlCATION <br />Agency or organization name: Cobratlo Division Oi Minerals Antl Geology <br />Task X: 046 State: Colorado PermiVOb X: P92.081 <br />Date: 011262003 County: Routt Abbreviation:nare <br />User- JRS Si[e: Hayden Gulch LOadout Filename: C081-046 <br />Permit or other job action: Permif Renewal d2 <br />Task description : Mobtlize/Demabilize Equipment for Pontl Femoval <br />Shia basis: t <br />Cost data source: C <br />Truck tractor tlescdption: <br />Truck trailer Description <br />E EQUIPMEM <br />Machine <br />Descrption WeghWnit <br />(Ions) Ownership <br />CosVbr/unit Haul Rig <br />Cosl/nr/unit Fleet Siie <br />(NO. units) Haul Trip <br />CasMrtlleat Return Trip <br />Costlhr/fleet DOT permit <br />CosNleet <br />-Cat 09R-9SU fiS96 553.66 $11B.2B 1 $171.94 $118.28 50.00 <br />-Reveg Equipment 20.00 566.00 $]9.90 f $145.90 57990 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5317.84 4198.78 50.00 <br />ROAOABLE EQUIPMENT <br />Machine <br />Description Total <br />osMour/unil Fleel Size <br />(NO. units) Haul Trip <br />CosVhr/llaet Return Trip <br />Cosbhrfllaet <br />-Flatbed Truer, 6x1, dSKGIM/ $90.64 / 890.64 $90.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 590.64 590.64 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest mal or city or town within project area region : Crsig <br />Transoonafon Cwle Time: Nom Total qne-way travel distance: 400 miles <br /> Roatlable Roadable Avaroga tmvel speetl: 40.0 mph <br /> Equipment Equipment <br />Haul time (hours)= 1.00 1.00 Total non-roadable mob/damob cost -: $1,667J0 <br />RBWm time (hours)= 1.00 1.00 -Nro muM trye with luW ng <br />LOadlog time (hours)= 0.50 NA Total readable mob/demob cost -': $tet28 <br />Unloatling time (hours)= 0.50 NA one mmdtrip.rolaW n9 <br />Subtotals= 300 2.00 <br />JOB TIME ANO COST Total lob time: 6.00 hours <br /> Total lob cost (1,849 <br />