Laserfiche WebLink
CIRCES Cost Estlmatlna Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Agency or organization name :Colorado DiWSbn O/ Mine215 Antl Geology <br />Taskx: 045 $tate:GOlPradO PartniVjob x: C-92-081 <br />Date: 02/262003 DOMty:ROUtt Abbreviation:nwre <br />Usan JRS Site: Hayden GUkh LOadout Rlename: COef-045 <br />PannR or other job action : Perms Renewe102 <br />Teak description : Mabilize/Demabl/ize Equipment for loft/al Reclamatlort <br />TRAN$PGRT RIG COST Shin basis : 1 Per daV <br />Truck ireaor description <br />Truck tmilar description: <br />NON-ROADABLE EQUIPMENT- <br />Machine <br />Dascriptiod WeighVUnil <br />(Tom) Ownership <br />CosMr/unit Haul Rig <br />CosVhr/unit Fleet Siza <br />(NO. units) Haul Tr'ry <br />CosMrtlleat Retum Trip <br />CosGhrflleef DOT permk <br />CosVYleet <br />-Caf D9R-95U 65.96 $53.66 5118.28 1 $171.90 5118.28 50.00 <br />-iAMROCK DHA 6005, 4.0 12.25 351.54 379.90 f $131.44 $]990 $0.00 <br />-CAT f4H 20.10 $35.72 579.90 1 5115.62 $79.90 $0.00 <br />-Cef 62]G w/pvthpull 42.04 $46.13 $108.11 2 5308.6] $11622 50.00 <br />-Reveg Equipment 20.00 566.00 $79.90 1 $145.90 $79.90 50.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 4873.37 S57d.20 50.00 <br />I S•LIeT l ~LiXfilrL~,J3uI <br />Machine <br />Description Total <br />osMOUr/unit Fleet Size <br />(NO. units) Haul Trip <br />CosMr/Ileat Retum Trip <br />CosLhr/fleet <br />-Fuel Tanker, 4x2, t ]0 HP $44.64 1 844.64 $44.64 <br />-Flatbed Truck, 6x4, aSKGIM/ 390.64 1 S9D.64 890.64 <br />-Water Tanker 2.500 Gal 83913 ] $39.13 $39.13 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: $1]4.01 5174.41 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest mot or city or town wiNin protect area region : Craig <br />Transoortation Cvde Time: Non- Total one-way travel tlistance: 40.0 miles <br /> Roatlable Roatlable Average travel speed: 40.0 mph <br /> Equipment Equipment <br />Haul lima (hours) = 1.00 L00 Total non-roatlaDle moWtlemob cost -: 56,368.64 <br />Return time (hours)= 1.00 1.00 -wo mars inw with haul rig <br />Loatling time (hours)= L00 NA Total roadable moWdemab cast": $34882 <br />Unloadin9lime (hours)= 1.00 NA one roues up, mtaul rq <br />svbmtala= a.oo 2.00 <br />JOB TIME AND COST To[al job time: 8.00 hours <br /> Total job cost : 56,737 <br />