Laserfiche WebLink
CIRCES Cost Eatimatina Software <br />Agency or organization name : Colo2do Division O/Minerals Md Geology <br />Tasks: 047 State:Colorztlo Perm~ob M: C-92.081 <br />Date: 02/262003 Counry:ROUtt Abbreviation: none <br />User: JRS Site:Hayden Gulch LOadout Filename: CO81-041 <br />PannN or other job action : Permd Renewa102 <br />Task description : Moblllze/Oemobillze Equipment /or Slte Maintenance anO Pontl Cleanln <br />EQDIPMENT TRANSPORT RIG 0057 - Shia basis: <br />(iOSl delta a00rCe: <br />Truck tractor tlascription :Generic on-highway frock hector, 6x4, dieselpowered. Of <br />Truck Vailer description :Generic IWding gooseneck, drop deck equipment frailer (.~ <br />NON-ROADABLE EQUIPMENT' ' <br />Machine <br />Description WeighVunk <br />(Tans) Ownership <br />Cosbhr/unit Haul Rig <br />Cpstfir/unit Fleet Siza <br />No. un¢s) Haul Trip <br />CaabhrRleet Ratum Trip' <br />CosVhrdleet DOT permit <br />CosVlleet <br />-Cat 330CL 31.16 540.79 5108.11 1 S1d8.90 $108.11 $0.00 <br />-Cat D3G LGP-3P 969 59.02 57990 5 5446.64 $399.50 50.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />' Subtotals: 5595.50 5507.61 50.00 ' <br />ROADABLE EQUIPMENT <br />Machine <br />Description Total <br />Cosvhour/unit FIeeI Size <br />(NO. units) Haul Trip <br />Casbhr/fleet Return Trip <br />CosVhr/fleet <br />-Generic 12-18 cy 6x4 SfiZ06 5 8335.32 5335.32 <br />-Flatbed Truck, 6x4, 45KGVW 516.47 1 516.47 57647 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5411.79 5411.79 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest mo tor city or town within protect area region : Craig <br />T~rtation Cvcle Time: Non- Total one-way travel distance: 40.0 miles <br /> Roatlable Roatlabia Average travel speed : d0.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost' : 55,779.53 <br />Return time (hours)= f.W 1.00 'Iwo rwmtrys MM hutl rip <br />Loaoing time (hours)= 7.50 NA Total roadable mob/demob cost": 5ffi3.58 <br />Unloading time (hours)= 1.50 NA one rour4 try.rohaul rg <br />Subtotals= 5.00 2.00 <br />00B TIME AND COST Total job time: 10.00 hours <br /> Total lob cost : 56,603 <br />