E.tlIBIT <br />111ri1na rl^ ra^ ^+• <br />i+~aterial will be excavated from the stream <br />bed of the branch of the &epublican River. It will <br />then be loaded into trucks, by rr~eans of a front ead <br />loader, and hauled to the various locations of the <br />current road maintenance. Some material may be <br />stock-piled in the area shown, but generally the <br />gravel will be loaded directly into county dump <br />trucks. <br />No other machinery need be used except possibly <br />a dozer in the reclamation smoothing process. <br />i~ny part of the creek bank used for turning <br />and loading vaill be smoothed and prepared for <br />seeding at time of reclamation. <br />