Laserfiche WebLink
EXh.1fiIT - neclanation Plan <br />1. Description -_..of how will handle overburden <br />A creek bottom operation. There is no overburden <br />2. Thickness of top soil to be replaced: <br />A creek bottom operation. There is no top soil, <br />3. Describe gradient of reclaimed slope. <br />No slope will be left steeper tnan4;~• Vihen flooding <br />completes the reclamation the original slope will be maintained. <br />4. Describe seeding operation <br />None required. <br />5. Describe grass, forb, skrub and tree specie: <br />None, in creek bottom. No trees in area. Natural vegetation <br />is oresent on the banks of the creek. <br />6. Describe the applieatioa ~ aethod of seeding <br />tQo seeding in creek bottom. <br />7. Describe the ~uleh: <br />No mulch. <br />8. Desaribe and roads, streams & ponds that will remain: <br />No road will be built and none will remain ether than the trail <br />road used by the owner. <br />9. Describe how any left over rock etc. will be handled. <br />Any rock or unsightly material will be buried or hauled <br />to another site for disposal. <br />70. Financial warranty for private operators: <br />NA <br /> <br />PLEASE SEE RECLAiVtATION PLAN NARATIUE ATTACHED. <br />