Laserfiche WebLink
E7::iI3TT ~ - Mining plan _ See narrative <br />attached. <br />1. Dates of ,+lining, beginninb and ond. <br />Mining will not begin until pernit is granted. Aug. or <br />JeDt. 1 9a~$. <br />It is estimated that the gravel supply will last 20 years. <br />2. Description of depth of top soil & how stored. <br />This is a creek bottom operation. There is no top soil. <br />j. Description of.overburden <br />There is no overburden <br />4. Tkickness of gravel layer. <br />Testing indicates a gravel layer of from 1E'to ~t~, <br />5. Description of roads to & Eros pit - Show on eiap - Ex E; <br />Pit area borders on county road V and 13. No haul road will <br />be needed. <br />6. Skow disturbance to land surface. <br />The ohly land surface disturbed will be the creek bottom <br />itself. <br />~. 5how dimensions of existing and proposed roads that <br />will be used. <br />None needed. <br />8. Specify how such water will be used, if any. <br />No water will be used in this operation. <br />9. Describe any ground water and/or the affect. <br />This is a dry creek. The only time. there is any water ism <br />following a heavy rain. <br />10. Describe if will comply with Colorado Water Laws. <br />Yes. There will be no conflict. <br />11, Describe whether Gravel will be processed on site. <br />Gravel will not be processed. 'Used as mined. <br />