Laserfiche WebLink
<br />No. TOD1C Decision Date <br />TRS Hydrologic monitoring plan Approved 01/22/87 <br />TR9 Cessation of wildlife monitoring Approved 04/30/87 <br />TR10 Variable topsoil redistribution depth <br /> in Area 9/10 Approved 06/16/87 <br />TR11 Soil fertility testing Approved . 07/16/87 <br />TR12 Haul road reclamation plan Approved 02/01/88 <br />TR13 Pond A permanent impoundment Withdrawn 12/28/87 <br />TR14 Rill and gully plan Approved 02/01/88 <br />TR15 Air monitoring plan Approved 02/15/88 <br />TR16 Pond A permanent impoundment Approved 04/22/88 <br />TR17 Alternative end land use Approved 11/15/88 <br />TR18 Deletion of air monitoring Approved 07/16/88 <br />TR19 Modify channel improvement plan Approved 08/30/88 <br />TR20 Ponds, A, D, and G spillways Withdrawn 05/18/89 <br />TR21 Mine plan change Area 51/East Approved 12/27/88 <br />TR22 Bedrock well monitoring suspension Approved 01/27/89 <br />TR23 Hydro features/Small area exemptions Approved 06/19/89 <br />TR24 Area 61 postmining topography Approved 04/18/89 <br />TR25 Temp access road to topsoil pile Approved 07/06/89 <br />