Laserfiche WebLink
<br /> Technical Revision Summary <br /> (continued) <br />TR26 Small livestock water tanks Approved 10/23/89 <br />TR27 SAE topsoil pile 3-3 Approved 10/27/89 <br />TR28 Permit boundary, construction of Approved 01/26/90 <br /> dragline corridor <br />TR29 Riprap mod, ponds A, D, and G Approved 05/31/90 <br />TR30 Surface Facilities Transfer Approved 07/24/91 <br />TR31 Drainage Control Items Approved 10/11/91 <br />TR32 Delete 3-year Veg. Sampling Approved 02/28/92 <br />TR33 Incidental Boundary Change A w/ C 02/28/92 <br />TR34 Land-use Change Withdrawn 10/16/92 <br />TR35 Permanent Gully Repair Approved 08/30/93 <br /> Minor Revisions Summary <br />No. TOD1C Decision Date <br />MR10 Installation of new water line Approved 01/22/87 <br />MR11 Geochem sampling, LMC tract Approved 02/26/87 <br />MR12 Extend rail track Approved 02/26/87 <br />MR13 Seed rate change to enhance shrubs Approved 03/13/87 <br />MR14 Temporary stoker pile Approved 03/31/87 <br />MR15 Ripping for seedling transplants Approved 04/07/87 <br />MR16 Seed mix change Approved 04/17/87 <br />MR17 Temporary Diversion Ditch Approved 04/17/87 <br />MR18 Herbicide treatment at aspen plots Approved 05/14/87 <br />MR19 Installation of Wadge well Approved 05/28/87 <br />MR20 Mine 2 grazing plan Approved 06/19/87 <br />MR21 Tipple operation change Approved 08/16/87 <br />