My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103026
DRMS
>
Back File Migration
>
Revision
>
REV103026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:46 AM
Creation date
11/22/2007 1:02:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Revision
Doc Date
4/25/1983
Doc Name
SR1/SL1 App - Attachment: Copy of 1976 MLRB Rules
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-ld- <br />V, ItI:C1,Ah41'I'!(h'J Pl;ltl~OI~WVCL' S7'ANUN11zS <br />• A. General. <br />These recl:cnation performance standards sVrall apply to open mining of <br />coal, sand, gravel, c{uarry aggregate :rnd limestone used for construc- <br />tion purposes. All operations performed corder permits issued by the <br />Board shall be carried out in a marurer consistart with standards set <br />fort)r in the Act and in the rules promulgated tlrcr-eundcr. <br />B. Grading, <br />1. All fin;rl grading oC the area of lapel affected shall produce a <br />gently wrdulatirrg topography or other such topography as is con- <br />sistent with the proposed land use of the area as stated in the <br />plan, provided, however, such grading s}rall create a topography <br />that is r-easonahle in view of the public .interest in ph}•sically <br />attractive surrowrdings. <br />2. Grading slr:rll be done in a marurer as to control erosion and <br />siltation oC the affected area, surrounding property, and water <br />courses, After consultation with the operator, the Board ma}• <br />require terracing to conserve moisture and control rater erosion <br />on all graded slopes during the process of current grading, <br />Terraces if used may be installed in such a manner as not to <br />{~rolribit vehicular access or revegetation procedures. Terraces <br />shall be installed at varying intervals as determined by climatic <br />conditions, spoil, topsoil or topsoil srilrstitute composition and <br />texture, sloirc, steclnress, and slope lcngtlr. Suggested terrace <br />installation intervals shall be submitted in Ure reclamation plan, <br />3. Plining and grading shall not affect the drainage or stream flow <br />in a marurcr that would impair or be detrimental to existing water <br />rights and to existing water quality. <br />4. Backfilling and grading of the disturbed area shall he completed <br />as soon :rs feasible after the mining process. The operator shall <br />establish reasonable timetables for backfilling and grading con- <br />sisteirt with good mining procedures. <br />5. All debris, acid-forming materials, saline materials, toxic <br />nuitcrials, matcr~ials constituting a fire hazard or materials not <br />conducive to vegetation growth and establislrmcirt shall be dis- <br />posed oC in such a manner as to prevent contamination of ground <br />and surface ruaters, to prevent sustained combustion, mrd to pre- <br />vent inhibition of plant growth acrd establishment. Identifica- <br />tion of such materials shall be the responsibility of the opera- <br />tor. 'Ibis section shall be interpreted in conformity with the <br />rules a»d regulations of the Water Quality Control Commission <br />and State Engineer. <br /> 6. The operator strap not use excavated areas for the deposition of <br /> foreign materials sudr as trash, industrial wastes, fly ash and <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.