Laserfiche WebLink
15- <br />4. The munber of acres for which revegetation was initiated and/or <br />completed during the previous year; and <br />• 5.' The species of vegetation pl;rnted, rates vid dates oC planting, <br />avid where each was utilized in the planting plan; .and <br />6. M appraisal of the success of reclamation efforts; and <br />7. Li the event of any failure of rcvegetation efforts initiated <br />in the }past year or any previous year, a short narrative as to <br />the suspected or determined causes of such failure; and <br />8. A statement of the type and quantity of any fertilizers, organic <br />material or soil conditioners introduced, avid a description of any <br />irrigation utilized on the affected area prior to or during re- <br />vegetation; and <br />9. Any information concerning ru~iyue problems or solutions to such <br />prol~leins of reclamation .technology that might have been encoun- <br />tered in the process of reclaiming tlic affected livid tivliicli might <br />be of ;rssistance to the [3oard in the completion of their duties <br />in acLninistering this Act; acid <br />10. ~~r appraisal o[ success made in meeting t}~e ;reproved timetable <br />for completion of reclamation of tt~e affected lands. <br />C. Tlie above mentioned report shall be accompanied by a map or sarital~le <br />• overlay of maps submitted with the original application. Suds maps <br />shall show: <br />1. The outline of the affected area; and <br />2. M outline•of all areas regraded and topsoiled during tl~e previous <br />year; and <br />3. Ni outline of the areas seeded during tl~e previous year, showing <br />the dates of seeding; and <br />4. M outline of the area revegetated during the previous year; and <br />5. M outline of. any and all areas where reclamation has been com- <br />pleted during the previous year; and <br />G. Irhere final grading and contouring have been completed, during <br />the previous year, an outline of the final grading plan showing <br />the final elevation by contours; and ~ <br />7. M outline of that portion of the affected area upon which mining <br />was corrchrcted durv>g the previous year; a7id <br />8. l'he map shall show progress made to date acid progress required to <br />be made under tl~e timetable approved in .the permit application. <br />J <br />