Laserfiche WebLink
I~- <br />2. The reclanation plan shall include: <br />a. fl narrative describing 1) which of the approved uses the <br />ol~e+-ator proposes to acluieve in the reclanation of tl+e <br />affected laiud, 2) wliy each use was chosen, vtd 3) tl+e amowtt <br />of acreage accorded to each; arid. <br />b. A narrative describing ho+a the reelan+ation flan will be. <br />implemented to meet the performance stm+dards set Forth in <br />tl+ese rules ;u+d evidence to show tl+at the reclamation plan <br />will be acl+ievcd; m+d <br />c. A proposed timetable indicating when ;ind how the reclamation <br />plan shall be implemented; mtd <br />d. A narrative describing how the reclamation plan shall re- <br />habilitate the surface disturbances caused by the open <br />mining operation. 1'he narrative shall it+clude but not be <br />limited to the following factors: natural vegetation, wild- <br />life, water, air and soil resources. <br />3. Tlie map accompauuying the reclamation plan shall include all of <br />the land to be affected by all phases of the total scope of the <br />open mviing operations. It shall indicate: <br />-~ a. 7-he expected physical appearance of the area to be mined and <br />the area of l:u+d affected, correlated to the timetable; and <br />b. Portrayal oC tluc proposed final la+td use for eaclu portion of <br />the affected lands. <br />4. Prior to approving any new reclamation plm+ or approving a <br />significant change in any existing reclamation plan, the Board <br />shall confer with the local board of county commissioners and <br />tl+e I~oard of supervisors of the Soil Conservation District if <br />Urc opc+u mining operation is within the boundaries of a Soil <br />Conservation llistrict. <br />IV. ANNUAL RECLAMATION REPOR'T'S <br />A. To enable the Board to ascertain uvhether tl+e approved recla+++ation <br />plvu is progressi++g satisfactorily and according to the timetable <br />approved in tl+e original application, the operator shall submit to <br />tlue Board tl+ree copies of an annual reclamation report that sets out <br />in det:+il al] measures taken to reclaim the affected area and tl+e <br />pu-ogress of [luc mining operation, during tl+c twelve month period be- <br />ginning on Cktober 1 and ending on September 30. Phis report is to <br />be submitted to the Board before March 1 oC the following year. <br />B. Such report s}+all include: <br />1. A statement of tlue operator's name, address a+ud permit number; and <br />2. 'llue n+llnber oC acres of affected land resulting from operations <br />during tl+e preceding year; and <br />• 3. The mnnber of. acres for which grading was initiated and/or com- <br />pleted during the preceding year; and <br />