Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 005 <br />Date : 11232005 <br />User : JHB <br />State :Colorado <br />County :Jackson <br />Site : Mam Mine <br />Agency or organization name :Colorado Division Of Minerals And Gc <br />Permit or other job action : RNS 2005 <br />Task description : Backfill and Regrade Pond F <br />HOURLY EQUIPMENT COST <br />Basic machine :CatDBR Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Ownership cosVhour <br />Operating cosUhour <br />Ripper op. cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />Swell <br />factor <br />Permitfjob# : C-80-006 <br />Abbreviation :none <br />Filename :0006-005 <br />SSU Horsepower: 310 <br />Utilization <br />$48.82 NA <br />$66.09 100 <br />$0.00 0 <br />$31.78 NA <br />$146.70 Total fleet cosUhour : $1~ <br />Loose <br />1.125 volume : 6,581 LCY <br /> <br /> <br /> <br /> <br /> <br />volume : 5,850 CCY <br />Source of estimated volume :Permit Volume 12, Page 33R <br />Source of estimated swell factor :CAT Handbook - <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (/ <br />Average site altitude : 8,200 feet <br />Material weight : 2,650 tbs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift/dat <br />Spoil pile : 0.60 (fnd-sf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SUAI) <br />Net correction : 0.29 <br /> <br />Adjusted unit production : 184.99 LCY/hr <br />Adjusted fleet production : 184.99 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job lime : 35.58 Hours <br />Unit cost : $0.793 /LCY Total job cost : $5,219 <br />