My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102987
DRMS
>
Back File Migration
>
Revision
>
REV102987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:43 AM
Creation date
11/22/2007 1:02:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
11/25/2005
Doc Name
Review Memo
From
Janet Binns
To
Jim Burnell
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # <br />Date <br />User <br />006 State :Colorado <br />11/23/2005 <br />JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action : RN05 2005 <br />Task description :Backfill and Reprade Pond G <br />HOURLY EQUIPMENT COST <br />County :Jackson <br />Site :Marc Mine <br />Basic machine :Cat DSR Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br /> OperatingcosUhour : $66.09 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $31.78 NA <br /> Total unit cosUhour : $146.70 Total fleet cosUhour : $146.70 <br /> <br />< .:; <br />MATERIAL QUANTITIES ;: <br />::: <br />Initial Swell Loose <br />volume : 9,982 CCY factor : 1.125 volume : 11,230 LCY <br /> <br />Source of estimated volume :Permit Volume 12, Page 33R <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION ~ ~ ~~ Job Condition Correction Factors Source ~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (fshift/day) <br />Compacted fill orembankment Spoil pile : 0.60 (fnd-si) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8,200 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 650 Ibs/LCY Net correction : 0.29 <br />Weight description <br />Decomposed rock - 25% Rock, 75% EaRh Adjusted unit production : 184.99 LCY/hr <br /> Adjusted fleet production : 184.99 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 60.70 Hours <br />Unit cost : $0.793 /LCY Total job cost : $8,905 <br />PermiUjob# : C-80-006 <br />Abbreviation :none <br />Filename :0006-006 <br />Horsepower: 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.