Laserfiche WebLink
CIRCES Cost Estimatin~t Software <br />BULLDOZER WORK <br />Task # : 004 <br />Date : 11/23/2005 <br />User: JHB <br />State :Colorado <br />County :Jackson <br />Site :Marc Mine <br />Permitlob# : C-80.006 <br />Abbreviation :none <br />Filename :0006-004 <br />Agency or organization name :Colorado Division Of Minerals And Ge <br />Permit or other job action : RNS 2005 <br />Task description : Bac~ll and Regrade Pond C <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series II - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownershipcost/hour : $48.82 NA <br />OperatingcosUhour : $66.09 100 <br />Ripper op. cost hour : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $146.70 Total Fleet cosUhour : $146.70 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 5,705 CCY factor : 1.125 volume: 6,418 LCY <br />Source of estimated volume :Permit Volume 12, Page 33R <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (F <br />Average site altitude : 8,200 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Horsepower: 310 <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net wrrection : 0.29 <br />Adjusted unit production <br />Adjusted fleet production <br />248.66 <br />248.88 <br />(Cat HB) <br />(S/SU/U) <br />LCY/hr <br />Lcvmr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 25.81 Hours <br />Unit cost : $0.590 /LCY Total job cost : $3, 786 <br />