My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102543
DRMS
>
Back File Migration
>
Revision
>
REV102543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:12 AM
Creation date
11/22/2007 12:56:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
5/11/2000
Doc Name
RESPONSE TO DMG 4/26/2000 TR26 CORRESPONDENCE BMRI SAN LUIS PROJECT PN M-88-112
From
BATTLE MOUNTAIN GOLD CO
To
DMG
Type & Sequence
TR26
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br /> <br /> <br /> <br />also provide additional capacity for temporary storage. Thus, BMRI feels that the water <br />treatment facility has sufficient redundancy arjd capacity to maintain the tar~et water level <br />elevation in the backfilled West Pit under-routine conditions. In the event ot1 a catastrophic <br />system failure, the water pumped from the West Pit would be transferred to the lined tailings <br />facility until the water treatment facility could be brought back on line. <br />Comment: <br /> <br />1 <br />3. BMRI must submit the required Shewart-CUSUM charts for a eight (8) <br />performance monitoring wells by Ivlay 26, 2000. The charts must incl de monitoring <br />results for December, 1999 and January, February, March, and Ap 1 2000. The <br />charts will be submitted every month thereafter for previous mont 's monitoring <br />results until the performance monitoring ceases. <br />' Response: <br /> <br /> <br />A brief discussion of the Shewhart-CUSUM results and the associated chart;; for the eight <br />performance monitoring wells aze presented in Attachment B. Subsequent monthly <br />performance monitoring water quality data will be submitted as the data az~ received and <br />analyzed according to the time schedule specified by DMG. <br />' Comment.• <br />1 <br /> <br />4. BMRI must submit an updated map showing the location of the "inte#ceptor" wells, <br />the new point of compliance (M-34), the new injection wells and the piping system <br />for the interceptor wells to the injection wells and the process water system tot he <br />infiltration trench. The map must be submitted to the Division by May ~26, 2000. <br />t Response: <br />II <br /> <br />1 <br /> <br />^, `~'~ ~ <br />A map showing the requested facilities is included as Attachment A. <br />Battle ,4launtain Resources <br />3 <br />i,Niller, lnc. <br />,Liay s, zooo <br />
The URL can be used to link to this page
Your browser does not support the video tag.