Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Comment <br />5. BMRI must submit certified as-built drawings/maps for the nano-filtr tion system to <br />the Division by June 10, 2000. If there are no changes to the existing draft <br />drawings/maps (dated October, 1999) they can be re-submitted after being certified <br />by a registered professional engineer. <br />Response: <br />d <br />BMRI requests that DMG approve TR-026 with a condition requiring submittal of the as- <br />built information. The as-built drawings/maps aze currently being finalize. BMRI will <br />deliver the final as-built drawings/maps [o DMG immediately upon receipt from the <br />contractor. <br />Resources /nc. <br />4 <br />i,Nif(er, Inc. <br />,~i%s, anuo <br />