Laserfiche WebLink
<br /> <br />30. The proposed gauging and rating schedule is included in Exhibit 4e-7. A copy of <br />the revised exhibit is attached. <br />31. See comments to number 30 above. <br />32. Exhibit 4e-7 has been revised [o address this concern. A copy of the revised <br />exhibit is attached. <br />Ponds, Impoundments, and Diversions; Rule 2.0 .3(4) <br />35. Page 2.05-79 and 79.1 have been to include text discussion for ponds B, C, and T. <br />The revised pages are attached. <br />33. Spring 58608-1 has been added t Figure SK copy of the revised figure is <br />attached. ,1Kp~,..,c_ 4 IL w+" 5~r'^'`^ ~"~ <br />34. Pond T has been to the text discussion on page 2.05-76.2. The revised pages is <br />attached. <br />36. Page 2.05-76.2 has been revised to depict the on-the-ground condition of three <br />separate dewatering cells. The revised pages is attached. <br />Site Description and Land Use Information; Rule 2.04.3(2) <br />37. Map 3 has been revised to address this concem. Please note that the information <br />presented on Map 3A has been incorporated onto Map 3, thus Map 3A is deleted <br />from the permit. A copy of the revised map is attached. <br />38. See comment to item 37. <br />39. See comment to item 37. <br />40. See comment to item 37. <br />41. See comment to item 37. <br />42. See comment to item 37. <br />43. See comment to item 37. <br />44. See comment to item 37. <br />45. See comment to item 37. <br />46. See comment to item 37, also pages 2.04-3 and 2.04-4 have been revised to <br />address the Division's comment. The revised pages and map are attached. <br />