My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101415
DRMS
>
Back File Migration
>
Revision
>
REV101415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:56 AM
Creation date
11/22/2007 12:45:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980143
IBM Index Class Name
Revision
Doc Date
11/29/1995
Doc Name
TEXAS CREEK GRAVEL PIT M-80-143 TR APPLICATION
From
DMG
To
NEILS EXCAVATION
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WORK <br />Task #: 1 Prep. by: SSS cask File Name: MI43-1 <br />Date: 09/15/95 Permit #:M-80.143 Mine: Texas Creek Gravel Pit <br />Permit Action: Recalculated Bond for Technical Revision No. 2- <br />Task Description: Regrade permit area <br />HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DBN Horsepower: 285 <br /> Blade Type: SEMI-UNIVERSAL ------- <br /> Attachment #1: ROPS Lab Shift Basis: 1/day <br /> Attachment #2: 3-shank ripper ----- <br />Cost Breakdown: <br />- --- Utilization X <br />Ownership cost/hr (46.40 N/A <br />Operating 8 overhau l cost/hr- dozer = f51.61 100 <br /> -ripper = f0.67 10 <br />Operator cost/hr f22.95 N/A <br />Total egpt. unit cost/hr = f121.69 Total fleet cost/hr : f121. 69 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 6,453.0 LCY Factor: N/A Volume: 6.453.0 LCY <br />Source of quantity take-off: Assume 4 ac. regraded P 1 ac. ft./ac <br />Source of est. swell factor: NA <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />h di f - -- <br />Avg. pus <br />stance: t. <br />50 ----- -- <br /> --- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 (Cat tbl) <br />dozer production: 1180 LCY/hr Dozing method..... 1.00 (gen.) <br /> -------- Visi bilitY........ ~ 1.00 (avg.) <br />Material consistency : Jab efficiency.... 0.83 (lsh/day) <br />Compacted fill or embankment Spoil pile factor. 0.80 (fnd-rf) <br />------------- ----------- Push gradient..... 1.00 (Cat tbl ) <br />Avg. push gradient: 0.00 X (pos) Altitude deration. 1.00 (Cat tbl) <br /> Material weight... 1.00 (Cat tbl) <br />Avg. site altitude: 7300 ft. Blade type........ 1.00 (S,SU,U) <br />Material weight 2300.00 lb/LCY Net Job Correction 0.45 <br />Mat. Descr.: <br />GENERAL FILL Adjusted Unit Prod.: 528.46 LLY/hr <br /> Adjusted Fleet Production: 528.46 LCY/hr <br />JOB COST <br />Fleet size 1 Dozers) Total Job Tice: 12.21 Hours <br />Untt Cost f0.230 /LCY Total Job Cost: f1,485.94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.