My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101415
DRMS
>
Back File Migration
>
Revision
>
REV101415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:56 AM
Creation date
11/22/2007 12:45:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980143
IBM Index Class Name
Revision
Doc Date
11/29/1995
Doc Name
TEXAS CREEK GRAVEL PIT M-80-143 TR APPLICATION
From
DMG
To
NEILS EXCAVATION
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WORK <br />Task $: la Prep. by: SSS Task File Name: M143-1a <br />Date: 11/20/95 Permit #:M-80-143 Mine: Texas Creek Gravel Pit <br />Permit Action: Recalculated Bond for Technical Revision No. 2 <br />Task Description: Backfill Highwall From Above <br />llOURLY EQUIPMENT COST <br /> Basic Nachine: Cat DBN Horsepower: 285 <br /> Blade Type: SEMT-UNIVERSAL --------- <br /> Attachment $1: ROPS Cab Shif t Basis: 1/day <br /> Attachment #2: 3-shank ripper --------- <br />Cost Breakdown: <br />---------- Utilization X <br />Ownership cost/hr = 546.40 N/A <br />Operating b overhaul cost/hr- dozer = 551.67 100 <br /> -ripper = 52.01 30 <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = 5123.03 Total fleet cost/hr: 5123.03 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 5.625.0 CCY Factor: 1.125 Volume: 6.328.1 LCY <br />Source of quantity ta ke-off: Assume backfill of 30'x300' highwall to 3: 1 <br />Source of est. swell factor: CAT Handbook <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Avg. push distance: 50 ft. -------- ----- ~------ <br /> - Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.80 (Cat tbl) <br />dozer production: 1180 LCY/hr Dozing method..... 1.00 (gen.) <br />- ------ Visibility........ 1.00 (avg.) <br />Haterial consistency: Job efficiency.... 0.83 (lsh/day) <br />Dry, non cohesive Spoil pile factor. 1.00 (doz-oc) <br />------- ---- Push gradient..... 1.35 (Cat tb1) <br />Avg. push gradient: 16.00 X (neg) Altitude deration. 1.00 (Cat tbl) <br /> Material weight... 1.00 {Cat tbl) <br />Avg. site altitude: 7300 ft. Blade type........ 1.00 (S.SU.U) <br />Material weight 2300.00 lb/LCY Net Job Correction 0.67 <br />Nat. Descr.: <br />GENERAL FILL Adjusted Unit Prod.: 792.11 LCY/hr <br /> Adjusted Fleet Production: 792.11 LCY/hr <br />J08 COST <br />Fleet size 1 Dozers) Total Job Tice: 7.99 Hours <br />Unit Cost 50.155 /LCY Total Job Cost: 5982.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.