Laserfiche WebLink
<br />RECLAMATION LOST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description Cost (f) <br />--I- -------------------I------ <br />I N/a I <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description I Cost (f) <br />------ I ------------------------------- I ---------- <br />I N/A I <br />I I <br />I I <br />I I <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. Task Description <br />--- I --------- <br />I <br />3 I Demolition0ispose of 5'x5'x10' mass @ 50.22/c.f. <br />4 Seeding As per attached worksheet <br />Fencing N/A <br />5 I Mob/Demob As per attached worksheet <br />Cast (f) <br />555 <br />51.397 <br />5783 <br />Subtotal (M): 52.235 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 56.899 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD d PROFIT <br />Item No. <br />-- l Item Description <br />- I <br />--------- Cost (S) <br />-------- <br />1. I <br />I Public Liability Insurance.... I <br />1.550% of dir. 5107 <br />2. Contractor's Performance Bond 0.975% of dir. I 567 <br />3. Contractor's Profit........... 10.00% of dir. 5690 <br />4. Job Superintendent..Equip. oper. serves as super.) <br />Subtotal (A): 5864 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 57.763 <br />B. DMG PROJECT ADNINiSTRATION EXPENSES <br />ites No.l Item Description I Cost (f) <br />I I <br />I I <br />1. I Minerals Prograa Adm S.OOX of cntr.l 5388 <br />NET INDIRECT COST PERCENTAGE: 18.151 Subtotal (B): 5388 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 51.252 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect casts): 58.151 <br />