Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task #`. .. 5 Prep. by SSS Filename..M143-5 <br />Date..... 18-Sep-95 Permit i¢ M:80.143 Mine......Texas Creek Gravel Pit <br />--- <br />Permit Action........ Recalculated Bond for Technical Revision - <br />No. 2 -- -- ---- - <br />Task Description..... Transport equipment to/from site <br /> <br />HOURLY EQUIPMENI COST -------- ------ ------- ------- ------ --- --'--- <br />- NOTE - This is a list to select from. not a list of mandatory items to inc lude. <br />Mob/Demob Eqp. Tractor 6x4, 75.000 lb GVW, 375 HP, diesel powered <br />~Lt. Trailer 25 ton folding gooseneck, drop deck <br />Med. Trailer 50 ton folding gooseneck, drop deck <br />~Hvy. Trailer 120 Ton folding gooseneck. drop deck <br />Pilot Car On-highway light duty truck, 4x2. 130 hp. 1/2 ton rating, gasoline powered <br />~~Hyd. Crane : Grove RT58D rough terrain hydraulic Crane. 20 ton capacity . 125 hp, 60 ft. boom <br />-Fuel Truck : 6x4. 3.600 gallon capacity. 210 HP, diesel powered <br />~Lube Truck 6x4, 2,500 gallon capacity. 210 HP, diesel powered <br />Flatbed Truck: 20.000 lb GVW, 175 HP, diesel powered <br />Last Update: -- - --- -------- --------- ----- <br />December. 1994 <br />- --- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = 527.88 531.23 538.36 51.81 519.89 56.95 512.79 55.71 <br />Operating Cost/hr 326.84 529.29 534.27 55.12 523.40 518.53 524.52 58.00 <br />Operator Cost/hr = 521.40 522.03 522.03 521.24 520.86 521.24 521.24 521.24 <br />Helper Cost/hr = 520.60 521.24 521.24 50.00 50.00 50.00 50.00 50.00 <br />Total - 596.72 5103.79 5115.90 528.17 564.15 546.72 558.55 534.95 <br />NON-ROADABLE EQUIPMENT: <br />------------ Weight Ownership Haul Rig Fleet Si ze Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Lost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />CAT DBN w/ rippers 39.50 546.40 5103.79 1 5150.19 5103.79 50.00 <br />Revegetation equipment 20.00 520.00 596.72 1 1116.72 596.72 50.00 <br />Subtotals 5266.91 5200.51 50.00 <br />