Laserfiche WebLink
<br />ESTIMATING FORM - REVEGETATION WORK cont'd <br />B. SHRUB S TREE TRANSPLANTS <br /> <br />Filename M143-4 sheet 2 of 2 <br />I MATERIAL:I PLANTING: f/PERT. TOTAL TOTAL <br />SPECIES NAME I DDAN./ACRE I STOCK TYPE 8 SIZE I f/PLANT S/PLANT I PELLET S/PLANT S/ACRE <br />°I I I I I I I <br />No transplants required) I I I I 50.00 <br />I I I I I I I <br />I I I I I i I <br />I I I I I I I <br />I I I I I I I <br />I I I I I I I <br />I I I I I I I <br />~I I I I I I I <br />Total transplant cost/acre: 50.00 <br />C. SEEDBED PREPARATION <br />Tilling method #1: chisel plowing * <br />#2: <br />553.95 <br />D. SEED APPLICATION Total cost/acre; (53 .95 <br />Seeding method: drill seeding * Total cost/acre: 560 .23 <br />E. FERTILIZING <br /> FERTILIZER / SOIL AMENDMENT UNITS/ACRE UNIT I f/UNIT f/ACRE <br /> <br />Materials u~•ed <br />#1: <br />No fertilizer/amendments required I I <br />I I I <br />I <br />50 <br />.00 <br /> #2: I I I I <br /> #3: I I 1 I <br /> I I <br />Total materials I I <br />cost/acre; <br />50 <br />.00 <br />Application method #1: No fertilizer application required 50. 00 <br /> #2: <br /> Total application cost/acre: 50 .00 <br />F. MULCHING <br /> MULCH / NETTING / OTHER MATERIALS I UNITS/ACRE UNIT I S/UNIT I f/ACRE <br /> <br />Materials used <br />#1: I <br />straw (delivered) - bale * I <br />10.00 bale I I <br />I 53.76 <br />531. <br />60 <br /> #2: I I I I <br /> #3: I I I <br /> #a: I I I I <br /> 1 I <br />Total materials I I <br />cost/acre: <br />531. <br />60 <br />Application method il: power ~nulcher (hay spr. 1' deep) '* 560 .11 <br /> #2: cri~girg (with tractor) * 541. 41 <br /> /3: <br /> Total application cost/acre: 5101. 52 <br />G. JOB COST <br />Total area to be seeded: 4.00 acres. Total S/acre 5279.31 Total Initial Jab Lost- 51,117 .24 <br />Esti~ated failure rate: 25.00% of area. Total f/acre* 5279.31 Total Reseeding Costs - 5279 .31 <br /> * Reseeding cost items: A C D F GRAND TOTAL JOB COST - 51,396 .55 <br />