Laserfiche WebLink
PLATTE BAND 8c GRAVEL LLC <br />INSPECTION RESPONSE - M-2000-158 <br />SEPTEMBER 30, 2005 <br />PAGE 2 <br />an Xcel signature on it for the file. On 9/23/05 Steve sent <br />a copy of the crossing agreement to Mr. Webb and he is still <br />researching their files as of this date. We believe the <br />confirmation letter is adequate to show we have authority to <br />cross under the powerlines. <br />3. Technical Revision #2 in the attached document addresses <br />this concern. <br />Technical Revision #3 in the attached document addresses <br />this concern and includes a bond evaluation to cover the <br />increased disturbance due to the change discussed in Techni- <br />cal Revision #1. This will increase the bond from $111,500 <br />to $115,000. No dewatering can take place due to permit <br />restraints so a dewatering cost was not included. This is <br />accounted for in the increased cut/fill unit volume values <br />for the working face grading used in the estimate. Please <br />contact Steve as you work thru the bond analysis. <br />Attached is a check for $188.00 to cover the Technical <br />Revision. if you have any questions please call me at (303) 274- <br />4404 or Steve O'Brian of Environment, Inc. At (303) 423-7297. <br />cc Environment, Inc. <br />Platte Trust, LLC. <br />file <br />enclosures <br />