My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-30_REVISION - M2000158
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000158
>
2005-09-30_REVISION - M2000158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:19 PM
Creation date
11/22/2007 12:44:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
Revision
Doc Date
9/30/2005
Doc Name
Response to Inspection Report- TR-03
From
Platte Sand & Gravel LLC
To
DMG
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Platte Sand & Gravel LLC Technical Revision 9/05 <br />S&H Mine -Permit # M-2000-158 <br />TECHNICAL REVISION 'I -PRIMARY HAUL ROAD RELOCATION <br />Our original plan was to use WCR 23 south to HWY 66 so the <br />original internal route left the Plant Site and crossed Sand Flats <br />Lake, Highlands Lake and Krystals Pond areas to exit the site in <br />the very southeast corner of the permit area. During our local <br />government hearing the City of Milliken and Weld County Public <br />Works Department determined that the only offsite haul route we <br />could use was WCR 38 east to State Hwy 60. As a result we were <br />forced to build the existing haul route across the Sand Flats Lake <br />area to intersect the County Road system at the intersection of WCR <br />23 and WCR 38. This is our primary haul route unless the County <br />and City approve an alternate route. <br />TECHNICAL REVISION 2 -Plant SItB ~@~OCat10(1 811d mining dlreCtlOn feVlSlOn. <br />The current approved permit shows that the Plant Site would <br />originally be located in the central part of Sharkeys Lake. Mining <br />was to begin on the north side of the Plant Site and work from <br />south to the northwest. Please review Figure TR-1 to see what is <br />described in the following text. At the landowners request this <br />was changed by moving the Plant Site approximately 1,200 feet south <br />so it did not interfere with their center pivot sprinkler as long <br />as possible. As approved in the permit the terrace deposit of <br />gravel in Highlands Lake area was mined (10 acre parcel) first. <br />Once this was done, mining began in Sharkeys Lake between the Plant <br />Site and the South Platte River and is being worked back to the <br />east. Mining will continue in this area to the north along the <br />west side until reaching a point approximately even with the north <br />side of the Plant Site. <br />At this time the plan is to wet mine the area using draglines <br />instead of a dredge until the area is lined and can be mined dry. <br />We understand that the liner can not be installed until approval of <br />the liner is received from the Division of Minerals and Geology. <br />Once the area west of the Plant Site is complete mining will <br />begin on the north end of Sharkeys Lake and work to the south <br />towards the Plant Site. This way we do not have to deal with <br />hauling the mined material around the lake being created as mining <br />progresses. Eventually this area will be enclosed with a slurry <br />wall and all water will be pumped out. Exhibit C1-TR is a map <br />showing the Sharkeys Lake area as it will be mined. <br />TECHNICAL REVISION #3 - DISTURBANCE AREA INCREASE AND BOND REEVALUATION. <br />The approved plan called for having 35 acres ± in various <br />states of disturbance, (15=plant, 10=mining and 10=reclaimed not <br />revegetated). During the initial mine start-up we have found that <br />this is not enough room and we need approximately 65 acres ± of <br />disturbance. The attached bond reevaluation reflects this change <br />and Figure TR-1 shows the areas currently disturbed. Under this <br />revision the Plant Site is enlarged to 30.00 acres ± and includes <br />the current topsoil pile area. The terraced deposit in Highlands <br />Lake covers 11.00 acres ± and is partially reclaimed and 24.00 <br />acres ± is active mining area which contains lake surface area that <br />needs no reclamation. All other disturbance numbers used are the <br />same as shown in the original bond reevaluation. With the excep- <br />tion of dewatering that can not take place due to permit re- <br />straints. This is accounted for in the increased cut/fill unit <br />volume values for the working face grading used in the estimate. <br />