Laserfiche WebLink
F. Equipment Mobilization/Demobilization <br />Equipment Used on Job Mob/Demob. Cost/Hr <br />14G Mntor Grader $166.47 <br />2- Cat 637 Push-Pull Scrapers 327.78 <br />Cat D9L Dozer 7.05.46 <br />John Deere 401 B Tractor 11F,17 <br />(assume use of 401 B tractor for <br />re vegetation, since re vegetation costs <br />are estimated by unit costs/acre) <br />Total Project Mob./Demoh. Cost/hr $814.88 <br />Equipment Haul Distance <br />Major population center Craig <br />Total Distance 100 miles <br />Average Speed 45 mph <br />i,.ti r;me <br />loading time .5 hours <br />unloading time .5 hours <br />travel time to site 2.2 hours <br />return travel time 2.2 hours <br />Total hours T~~ifours <br />Assume contractor will make two trips 10.8 hours <br />Total Job cost <br />10.8 hours X $814.88 hour $8800.70 <br />G. Reclamation Cost Summary <br />Mine Site Load Out <br />Earthwork <br />Bac i ing/Rough Grading 233,278.85 N/A <br />Finish Grading 12,519.24 N/A <br />Topsoil Replacement 151,991.82 2099.31 <br />Structure Demolition 5604.30 N/A <br />Revegetation 74,609.85 1860.89 <br />Mobilization/Demobilization 8800.70 <br />Total Direct Reclamation Costs 486,804.76 3960.20 <br />-6- <br />