Laserfiche WebLink
H. Indirect Costs (See attached sheet for cost breakdowns) <br />Overhead and Profit E 77,026.87 <br />Engineering Contract Preparation Fees 24,131.15 <br />CMLRD Management Expenses 6400.00 <br />Total Indirect Costs -1~T,55}~0'1 <br />I. Total Bond Amount (direct plus indirect costs) E598,322.98 <br />Bond Rounded to 598,000.00 <br />sa <br />6617E <br />cc: Mike Long <br />Sandy Brown <br />-7- <br />