Laserfiche WebLink
F. <br />Structure <br />Shop <br />Shop Footings <br />ShSpabloor <br />Traiiler Removal <br />(disassembly & <br />2 hour haul <br />time to Walden) <br />Tool Van (2 <br />haul time to <br />Walden) <br />Disposal of <br />Concrete (on <br />site) <br />position <br />Wood <br />Concrete <br />Concrete <br />Disassembly <br />Truck time <br />Truck time <br />Dimensions Volume/Area <br />30'X60'X25' high) 1687.5 ft3 <br />8" thick wood <br />12"X8" 180 ft2 <br />reinforced <br />re-har <br />30'X60'X6' <br />w/mesh <br />1800 ft2 <br />Concrete I 138.33 CY <br />Total Cost for Structure Removal <br />-5- <br />Structure Demolition <br />Unit Cost Total Cnst <br />.13/f t3 E 214.38 <br />2.59/ft2 I E 466.20 <br />2.29/ft2 <br />E500 <br />37/hr <br />37/hr <br />E4122.00 <br />E 574.00 <br />E 74.00 <br />3.88 CY <br />E 148.72 <br />I E5604.30 <br />