Laserfiche WebLink
DMG calculated the total reclamation liability for all 25 sites to be $16,723. DMG <br />allowed $8800 of this reclamation liability to be covered by the 13-site bond, and <br />required an additional $7923 in bond ($7923 is the amount on the MR-12 decision form). <br />Colowyo submitted a rider to the $8800 bond, increasing it by $7923 to $16,723. <br />MR-27 approved 13 "development" drill sites in the Wes[ Pit. We required no bond for <br />these 13 sites, as we apparently decided that the sites and holes would be reclaimed in <br />conjunction with the mining and reclamation of the West Pit expansion area. <br />MR-31 approved 4 coal exploration drill sites. We required $10,948 in bond. Colowyo <br />agreed, and requested the reclamation liability be covered by excess bond monies held by <br />DMG, which was done. <br />MR-34 approved 3 "in-pit coal quality" drill sites. We required $2643 in bond. <br />Colowyo agreed, and requested the reclamation liability be covered with excess bond <br />monies held by DMG, which was done. These three sites aze not in TR-50, but should be <br />added. <br />MR-35 approved 2 coal exploration drill sites and four ground water monitoring well <br />drill sites. All were to be located beyond the expected limits of any mining areas. We <br />required $5924 in bond for all 6 drill sites. Colowyo agreed, and requested the <br />reclamation liability be covered with excess bond monies held by DMG, which was done. <br />MR-40 approved 18 coal exploration drill sites. Twelve sites were not bonded, as they <br />were to be reclaimed through the mining and reclamation of the East and West Pits. The <br />remaining 6 sites were required to be bonded with $16,593 bond. Colowyo agreed, and <br />requested the reclamation liability be covered with excess bond monies held by DMG, <br />which was done. <br />MR-44 approved 12 coal exploration drill sites. Six sites were not bonded, as they were <br />to be reclaimed via the mining and reclamation of the East, Wes[, and Section 16 Pits. <br />The remaining 6 sites were required to be bonded with $]4,091. Colowyo agreed, and <br />,t \} requested the reclamation liability be covered with excess bond monies held by DMG, <br />\~ which was done. <br />Bond monies required by these MRs, added to the amount of the original 13-site <br />bond, comes to $66,922. <br />Adequacy items to be addressed: <br />The initial application should have requested a transfer of 71 borehole drilling <br />sites, rather than 70. Colowyo's list of borehole drilling sites in Table 1 should <br />have included site "10-89-6", shown on the TR-50 map in the SE SE of Section <br />10 as having a drilled hole on it. <br />