Bulldozer work: Tasks 007, 008, 009, 011 and 013 - As stated above, the pit <br />lengths and volumes were based on an actual on-the-ground worst-case based <br />on the Division's 24 August 2004 bond compliance inspection. If there is a <br />nomenclature problem with the pits listed, this was the nomenclature used by <br />SCC and fhe Division during the inspection. The main point is that the <br />estimate values are based on real conditions that existed at a point in time (24 <br />August 2004). <br />6. Haul Facilities Area Surface Material to Pit: Task 015 -The Division agrees <br />that this task would not be performed in an actual reclamation situation. The <br />Division has changed task O15 to grading the material into the fill. This is not, <br />however, included in task 020 -Rip Facilities Area. Task 020 is to relieve <br />compaction of the area prior to grading. <br />Dispose of Coal Stockpiles: Task 016 -The Division agrees with SCC on this <br />task. Task 016 will be removed from the estimate. <br />8. Ripping, Road Reclamation and Finish Grading Work: Tasks 026 and 027 - <br />These tasks are not the same tasks. Task 026 is the major cut and fill work <br />associated with the road reclamation. Task 027 is a minor grading task for <br />grading the roads to blend. Task 027 was a dozer task but, based on <br />discussions with SCC in the past, it was changed to a motor grader. These <br />tasks are not the same as the ripping task (task 024). For all road reclamation <br />tasks there is a ripping task and a regrading task. <br />Task 028 -Haul Surface Material from Haul Roads to Pit -The Division <br />agrees with SCC that this task would not be completed during reclamation. <br />The surface material would be graded in with the backfill. The Division has <br />changed this task to a dozer task for the grading of this material. <br />Task 029 -Grade Culvert Embankments -The Division agrees with SCC that <br />this task is unnecessary (although it has been in previous estimates). It seems <br />to be a redundant task to the narrowing and grading of the permanent roads <br />tasks. This task will be removed from the estimate. <br />Tasks 030 and 031 -Grade Haul Roads to Blend and Grade Light-Use Roads <br />-The equipment used for this task was changed from a dozer to a grader <br />based on past discussions with SCC. Task 030 is not the same as task 025. <br />Task 025 is a ripping task. For all road reclamation tasks there is a ripping <br />and a grading task. <br />Task 035 -Final Grade All Mine Areas -This task represents final grading <br />(versus rough grading) of backfilled pit areas. It includes such things as <br />knocking down small piles and/or ridges of spoil that may have been missed <br />during the rough grading process (when bulk earth movement, in the quickest <br />manner possible, is the goal). As with the other motor grader tasks above, this <br />was traditionally a dozer task. In fact, at one point SCC included an <br />10 <br />