Laserfiche WebLink
U <br />October 2004 <br />-6- <br />043-2170 <br />1.6 Certification Boundary <br />Items addressed in the Phase Nc OSA Certification Report include the following: <br />• Underground workings remediation; underdrain construction; leak detection trench <br />construction; site grading; SF and subgade prepazation; SLF installation, placement <br />and compaction; 80-mil geomembrane installation; installation of HVSCS piping; <br />DCF placement; and <br />• Construction of the permanent diversion channel upgradient of Station 7+00. <br />• <br />• <br />The certified limits of the Phase Nc OSA are shown in Figure 2. <br />ew.u~xmaomcen~nrorvo~owio-uv~aaauixutcenenrvcao~ Golder Associates <br />