My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/22/2007 12:19:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Phase IVc Ore Storage Area Liner Certification Report
From
Anglo Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -5- 043-2170 <br />• activities that occurred. On-site Golder CQA personnel, the Certifying Engineer and the Project <br />Engineer discussed construction activities on a regulaz basis. In addition, field personnel prepared <br />daily observation reports. Golder submitted these daily reports and a daily summary report to CC&V. <br />Daily reports are not included in this report but were available for Colorado Division of Minerals and <br />Geology (DMG) review during the course of the project. <br />1.3.2 Weekly Construction Summary Reports <br />Golder prepared weekly construction summary reports, which were submitted to CC&V and to the <br />DMG. Weekly reports for the period of September 2001 through August 2002 are presented in the <br />October 2002 Phase Na Certification Report, weekly reports from the period of September 2002 <br />through June 2003 are presented in the June 2003 Phase Nb PSSA Certification Report, and weekly <br />reports during the period of June 2003 through October 2003 are presented in the October 2003 <br />Phase Nb OSA Certification Report. The weekly reports during the period of April 2004 through <br />October 2004 aze presented in Appendix D. <br />1.4 Project Specifications <br />• <br />A11 work was performed in accordance with the design plans and specifications in Amendment No. 8 <br />to Mining Permit M-1980-244 and subsequent revisions as approved by DMG. Issued for <br />Construction (IFC) drawings are presented in the Drawings section of this report and project <br />specifications aze presented in Appendix E. No specification changes were documented during the <br />Phase Nc 2004 construction season. <br />1.5 Record Survey Documentation <br />Ames Construction of Aurora, Colorado provided the Record Drawings for the activities associated <br />with the Phase Nc OSA. A Colorado Registered Land Surveyor prepared the drawings. The Record <br />Drawings are presented in Appendix A. The Surveyor's certificates aze presented in Appendix F. <br />Ames also provided locations for SLF density tests, SLF depth checks, geomembrane panel <br />intersections, and destructive tests, which were used by Golder to develop the test summaries and the <br />as-built geomembrane panel layout drawing. <br />• <br />uwn„uw,ao~an~nenrv<-,aoa~w.,:~m.n.w.<wx«wnrv<.ua Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.