My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/22/2007 12:19:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Phase IVc Ore Storage Area Liner Certification Report
From
Anglo Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -4- 043-2170 <br />• certifications prior to geosynthetics deployment. Golder performed geosynthetics CQA activities in <br />accordance with the CQA Plan. Geosynthetics CQA activities performed included: <br />• Observation and documentation of geomembrane deployment, trial seams, seaming, <br />destructive testing, and non-destructive testing (pressure tests and vacuum tests); <br />• Performing conformance testing of geomembrane; <br />• Measuring geomembrane panel thickness and confirming adequate panel overlap; <br />• Visually inspecting geomembrane sheet quality, sheet grinding, seam alignment, <br />and continuity; <br />• Retaining archive samples of geomembrane destructive tests and trial seams; and <br />• Observation and documentation of geogrid deployment for remediation of <br />underground workings. <br />1.3 Project Coordination <br />Golder CQC and CQA activities were directed by Golder. The Golder Resident Engineer for the <br />period September 2001 to December 2002 was Mr. Bob Nichols, and the Golder Project Resident for <br />(. the remainder of Phase Nc construction was Mr. Ron DiDonato. The Certifying Engineer, <br />Mr. John F. Lupo, Ph.D., P.E. or his representatives (Ms. Kimberly Finke Morrison, P.E., R.G., <br />Senior Project Engineer, and Mr. James M. Johnson, P.E., Principal) made periodic site visits to <br />resolve technical issues and to review Golder activities. Golder staffing from the period of September <br />2001 through August 2002 are presented in the October 2002 Phase Na Certification Report, staffing <br />from the period of September 2002 through June 2003 are presented in the June 2003 Phase Nb <br />PSSA Certification Report, and staffmg from the period of June 2003 through October 2003 are <br />presented in the October 2003 Phase Nb OSA Certification Report. Appendix C presents a summary <br />of the Golder staff on-site during the period of April 2004 through October 2004. <br />Representatives of CC&V, Ames, Poly-Flex, and Golder conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />1.3.1 Daily Construction Summary Reports <br />Golder prepazed daily construction summary reports as well as photographic documentation <br />• (Appendix B) throughout the project to document the key elements of construction and the CQA <br />c~a~zvmwoo~c.,+~eenrv~aoosw+nmowao.~ue~c.~wurv~a~ Golder Associates <br />