Laserfiche WebLink
October 2004 -4- 043-2170 <br />• certifications prior to geosynthetics deployment. Golder performed geosynthetics CQA activities in <br />accordance with the CQA Plan. Geosynthetics CQA activities performed included: <br />• Observation and documentation of geomembrane deployment, trial seams, seaming, <br />destructive testing, and non-destructive testing (pressure tests and vacuum tests); <br />• Performing conformance testing of geomembrane; <br />• Measuring geomembrane panel thickness and confirming adequate panel overlap; <br />• Visually inspecting geomembrane sheet quality, sheet grinding, seam alignment, <br />and continuity; <br />• Retaining archive samples of geomembrane destructive tests and trial seams; and <br />• Observation and documentation of geogrid deployment for remediation of <br />underground workings. <br />1.3 Project Coordination <br />Golder CQC and CQA activities were directed by Golder. The Golder Resident Engineer for the <br />period September 2001 to December 2002 was Mr. Bob Nichols, and the Golder Project Resident for <br />(. the remainder of Phase Nc construction was Mr. Ron DiDonato. The Certifying Engineer, <br />Mr. John F. Lupo, Ph.D., P.E. or his representatives (Ms. Kimberly Finke Morrison, P.E., R.G., <br />Senior Project Engineer, and Mr. James M. Johnson, P.E., Principal) made periodic site visits to <br />resolve technical issues and to review Golder activities. Golder staffing from the period of September <br />2001 through August 2002 are presented in the October 2002 Phase Na Certification Report, staffing <br />from the period of September 2002 through June 2003 are presented in the June 2003 Phase Nb <br />PSSA Certification Report, and staffmg from the period of June 2003 through October 2003 are <br />presented in the October 2003 Phase Nb OSA Certification Report. Appendix C presents a summary <br />of the Golder staff on-site during the period of April 2004 through October 2004. <br />Representatives of CC&V, Ames, Poly-Flex, and Golder conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />1.3.1 Daily Construction Summary Reports <br />Golder prepazed daily construction summary reports as well as photographic documentation <br />• (Appendix B) throughout the project to document the key elements of construction and the CQA <br />c~a~zvmwoo~c.,+~eenrv~aoosw+nmowao.~ue~c.~wurv~a~ Golder Associates <br />