~ • • <br /> In order to return the ditch to its original point of exit, it will be <br /> necessary to construct a siphon system, since the elevation at the point <br />' of exit is higher than a portion-of the land_that_the reroute traverses. <br />A feasibility study has been done by Del-Mont Engineering and it has <br /> been determined that such a plan is entirely possible. FF'' <br />-- - -- --- -- <br />~~ SdE lT <br />' . <br />~ <br />w <br /> As the irrigation ditch serves landowners downstream, the siphon system <br /> will be constructed prior to mining activities that will require <br />' abandonment of the ditch in its present location. <br /> ~ Ph <br />' <br />-~j ase IV and Phase V, consisting of 6.5 acres and 17.6 acres <br />respectively, will remain unaffected by mining activities until the <br /> gravel resource in the previous three phases has been depleted or nearly <br /> so. At such point in time, mining will commence in phase IV and <br />' subsequently into phase V with the removal of the topsoil from the area <br /> scheduled for mining. The topsoil will be p3_ane_d~n storage in the <br /> ~phaSP.II..a Excavation will commence at the northern end of phase <br /> IV-and-proceed in a southerly direction through the entirety of phase V <br />' as demand dictates. <br />' As mining progresses, a portable crusher will intermittently be located <br />on the site and gravel stockpiles will be situated at various points as <br /> mining proceeds. <br /> <br /> Backfilling and initial grading of the slopes will be done concurrently <br /> with the mining process. Final grading and placement of topsoil will be <br />' accomplished in a timely manner. It is expected that revegetation <br />efforts will be performed as mining activities are completed ih each <br /> phase, based upon the pre `sump ion at no furt er mining o= mining <br />' related activity is to occur. <br /> Underground water is not present on the site above the planned depth of <br /> excavation. Impounding of groundwater will not occur at this site. <br />1 ~ <br /> It is anticipated that the life of this mine is approximately 15 to 20 <br /> years, based on current market conditions. <br /> I <br /> <br />1 1 CMG << IrPG( ~i ~a.~,.. U / SfC ~,/~-~. ~7 ~,~,'S r - T~ w~ l~ ~ r <br /> V ~ ~ ~ ~ ~ -- --- - / <br />u~E~l-~ ...E~~.. E.e ~k - - - <br /> <br /> <br />5 <br /> <br />