My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97946
DRMS
>
Back File Migration
>
Revision
>
REV97946
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:10 AM
Creation date
11/22/2007 12:14:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
4/14/1999
Doc Name
ROADSIDE MINE PN C-81-041 PERMIT RENEWAL 3
From
DMG
To
POWDERHORN COAL CO
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
riparian azeas within the permit area at the Ioadout, adjacent to current disturbed area may <br />be permitted for gravel mining in the near future. This could possibly impact final <br />reclamation of the Ioadout and adjacent area, and would also affect water level in the <br />alluvium. The operator has requested an extension until September, 1999, to evaluate <br />these factors, and develop a riparian revegetation plan for the Ioadout area if warranted. <br />The Division would approve such extension, and requests that a commitment to <br />evaluate and develop a riparian revegetation plan for the Ioadout by September 30, <br />1999, be submitted for inclusion in the reclamation plan for the Unit Train Loadout, <br />on page 14-9 of the application. The reclamation plan should address measures <br />which will be taken to minimize disturbance to established riparian vegetation in the <br />low lying areas of the Ioadout during the reclamation process. <br />7. This item concemed the need for updated mine plan maps and timetables. Information <br />addressing North Portal mine plan information has been addressed in Technical Revision <br />No. 29, currently under review. The operator has included a statement on amended page <br />12-ti, dated 3/20/99, stating that no further mining is proposed within the South Portals <br />mining area. <br />Should the situation change, and the operator plan to resume operations within the South <br />Portals mining area, a technical revision application containing updated mine plan <br />information (maps, narrative, tables, etc.), would need to be submitted to and <br />approved by the Division prior to resumption of mining. <br />Issue Resolved. <br />8. This item concerned various text and table discrepancies with respect to disturbed and <br />affected acreages. Most have been resolved with submittal of amendments dated 3/20/99. <br />One remaining discrepancy is noted. Amended page 12-3 states that "from 1974 to <br />1992, approximately 380 acres of surface lands have been disturbed..." This <br />corresponds to the total existing and proposed disturbance acreage of 379.65 acres <br />listed on amended Ta61e 12-1. Because the 48 acre CRDA-3 area has not yet been <br />disturbed, and only a portion of the 8.6 acre Cameo Borrow Area-2 has been <br />disturbed, the existing disturbance acreage specified on page 12-3 would appear to <br />be erroneous, and should be corrected. The 1992 reference should be updated to <br />1999. <br />This item requested a revised table of contents, which was provided. Item Resolved. <br />0. This item requested mapping detail on subsidence protection zones. This issue is being <br />addressed within the context of TR-29, for the North Portals mining azea. Further <br />information is not required at this time for the South Portals mining area, because further <br />mining within the South Portals mining azea is not proposed. As noted in Item 7, above, a <br />technical revision application containing the requested subsidence protection mapping <br />details for the South mine area would need to be submitted and approved prior to <br />
The URL can be used to link to this page
Your browser does not support the video tag.