Laserfiche WebLink
Documentation of construction activities and quality assurance testing shall be <br />recorded in an as-built report prepared by the Professional Engineer. Documentation <br />shall include obtaining survey and QA information of sufficient detail to prepare as- <br />built drawings of the constructed works. Documentation will also include <br />photographs of key construction activities and critical items. <br />Design modifications due to unanticipated site and subsurface conditions, may <br />become necessary, and may range in significance. If modifications to the designs <br />become necessary, they shall be discussed with BMRI and the Professional Engineer. <br />Significant design modifications (in the opinion of the Professional Engineer) must be <br />approved by the Professional Engineer, who will provide written notification to <br />BMRI. Design modifications will be documented in the as-built construction report. <br />Irrigation Pond <br />Detailed geotechnical investigations are underway to evaluate foundation conditions <br />• in the irrigation pond area and to identify suitable borrow source materials for <br />construction of the compacted soil liner. The results of these investigations will be <br />presented to DMG when available. The results may affect the procedures and <br />materials used in irrigation pond construction and could result in modifications to the <br />QA/QC plan described in the following subsections. <br />Site Prepazation <br />Site preparation in the irrigation pond area will consist of topsoil stripping. Topsoil <br />stripping will also be performed over the pond and diversion berm footprint, and in <br />the borrow azea (if required) and topsoil stockpiled for use on pond and diversion <br />berm outslopes, and borrow area reclamation. The depth of stripping will be based <br />upon the thickness of suitable topsoil. Water may be added to the excavation area if <br />the soils are dry and stripping work is generating excessive dust. <br />Gradine <br />Battle Mountain Resources, /nc. G-9 Telesto Solutions, /nc. <br />P;~ProjeclsV.12-Newmont(SavLUh)\SanLUie~krmit NveMmem - West Pit MerugemenOPeemi,AmeMmenl~3.0oc July 2A76 <br />