Laserfiche WebLink
<br />(7) The topsoil or growth media will be replaced evenly on the perimeter back <br />at depth of 4" to 8", and will average 6", where available. 40# available N & P <br />acre. <br />(8) There are no vegetative material or piles to be dealt with in reclamation of <br />(a) Not applicable. <br />(b) For special 111 operations and regular 112, the area proposed to be dis <br />operations, for which Financial Warranty and Performance Warranty have <br />be the affected area. <br />6.4.5 Exhibit E -Reclamation Plan <br />(2)(d) where applicable, plans for segregation, preservation and replacement, ~ <br />grading of soil and used for revegetation. The revegetation plan shall cont. <br />preferred species of grass, legumes, fortis, shrubs or trees to be planted, theme <br />of seeding and planting, the estimated availability of viable seeds in sufficient <br />species proposed to be used, and the proper time of seeding. <br />The items in the first sentence were answered earlier in this section in Section 3.1 <br />Material Handling. <br />(e) a plan or schedule indicating how and when reclamation will be im <br />shall include: <br />(i) an estimate of the period of time which will be required for the <br />reclamation. <br />Reclamation will start as soon as operationally feasible after there is sufficient roc <br />movement and product stockpiling. The operator will seed as soon as replacement <br />done. This is along-term operation, dependent almost entirely on CDOT and Sagu; <br />requirements in the area. <br />(ii) A description of the size and location of each area to be <br />phase. <br />This is not a phased operation. The entire permit azea is considered one sequ <br />continue east and north from the present opened azea. Mining will be based on bu <br />estimates that 5 - 8 acres will be used at a time, but this can vazy, depending on <br />'s and pit floor <br />be applied per <br />site. <br />d by mining <br />posted, shall <br />mpaction and <br />n a list of the <br />cods and rates <br />uantity of the <br />- Reclamation <br />The plan <br />stages of <br />for equipment <br />'topsoil can be <br />ie County road <br />during each <br />Mining will <br />demand and <br />pct size. <br />