Laserfiche WebLink
<br />(iii) An outline of the sequence in which each stage or phase or <br />carried out: <br />a. topsoil 4" - 8" where available - 6" average, <br />b. Fertilize with 40#/A available N & P, <br />c. drill seed, <br />d. mulch and crimp <br />(f) A description of each of the following: <br />The pit floor will be left basically flat. Backsloping has been explained eazlier and <br />(i) Final Grading <br />This will consist of replacing the available topsoil on the pit perimeter backslopes <br />(ii) Seeding type, quantities and expected time of seeding: <br />Soecies #/A PLS <br />Western wheatgrass 7.0 <br />Crested wheatgrass 1.0 <br />Indian ricegrass 5_5 <br />Total #/A PLS 13.5 <br />This is the drilling rate. Should seed be broadcast, the rate will be doubled. <br />Seeding is proposed for late Fall -late October or eazly November. Past experi <br />best results seeding at this time. SCS recommendations aze the same. <br />(iii) Fertilization type, quantity and time of application <br />40#/A available N & P will be applied shortly before seeding <br />(iv) Revegetation -type of trees, shrubs, etc. <br />None proposed for this rangeland revegetation. <br />(v) Topsoiling -specify anticipated minimum depth or range of depths <br />which will be topsoiled. <br />The operator will make every effort to salvage topsoil and growth media availab <br />topsoil varying from 4" - 8", with an average of 6". This is consistent with a visual <br />existing pit faces and what the operator expects to replace. <br />will be <br />be at 2H:1 V. <br />the pit floor. <br />has indicated <br />those areas <br />SCS reports <br />ection of the <br />