My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96956
DRMS
>
Back File Migration
>
Revision
>
REV96956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:28 AM
Creation date
11/22/2007 12:04:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Name
EXHIBIT 58 REVISED JUNE 13 1984
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised June 13, 1984 <br />Road and Surface Facility Area Reclamation <br /> The reclamation of haul roads and areas around surface <br />fac ilities will require the top 1 foot of material be removed and <br />pla ced in a pit and then ripped to a depth of 3 feet. Once this <br />has occurred, the area will be topsoiled and reveyetated. <br />1. 22.4 acres need reclamation (see page 7). <br />2. Volume of material to remove and haul to pit = 22.40 acres x 1 <br /> foot deep x 43,560 sq. ft/acre = 36,100 cy <br /> 27 cf/cy <br />3. Haul distance 2,000 ft. average <br />4. Cost to return material to the pit: <br /> a. Use 657 PP scraper @ 5178.54/hr <br /> b. Haul distance = 2,000 ft. <br /> c. 657 can move 408 cy/hr (808 eff., 68 RR, 08 grade), <br /> adjusted for altitude, 408 x .905 = 369 cy/hr <br /> d. Hours required = 36,100 cy = 98 hrs. <br /> 369 cy/hr <br />98 hrs. x 5176.54 = S 17,500 <br />5. Costs of ripping road surface <br />a. Surface ripped to a depth of 4 feet (includes 1 foot to <br />be removed) <br />b. 22.40 acres to be ripped, volume to rip = 22.40 x 4 x <br />43,560 = 144,600 cy <br />27 <br />c. Use a Cat D-9 dozer with single shank ripper <br />d. D-9 can rip 400 cy/hr (see page 57 in Cat Handbook and <br />correct for operator and job conditions) <br />Operator 0.79 <br />Visibility 0.9 <br />Efficiency 0.84 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.