My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96956
DRMS
>
Back File Migration
>
Revision
>
REV96956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:28 AM
Creation date
11/22/2007 12:04:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Name
EXHIBIT 58 REVISED JUNE 13 1984
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised June 13, 1989 <br /> <br />e. Hours required to complete work <br />144,600 cy = 362 hrs. <br />400 cy/hr <br />D9H costs $77.66/hr. <br /> <br />362 hrs. x $77.66/hr <br />Smooth Grading <br />Included in previous smooth grading costs. <br />Topsoiling <br />Included in previous topsoiling costs. <br />Revegetation <br />Included in previous revegetation costs. <br />Total Road and Surface Facility Area Reclamation Cost <br />_ $ 28,100 <br />= S 45,600 <br />e <br />Facility Removal Costs <br />It is estimated that the cost for removing the surface <br />facilities at the mine site will be approximately two times that <br />calculated to remove the tipple facilities. Based upon equipment <br />costs, these costs have inflated approximately 168. <br />Tipple Facility Removal Cost = 521,600* x 1.16 = $ 25,100 <br />Mine Facility Removal Cost = $25,100 x 2 = $ 50,200 <br />*From Kerr Tipple Amendment Application [Page 99(a)1 <br />Rough Grading - Shop Area <br />The rough grading required to reshape the shop area will <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.