Laserfiche WebLink
Revised June 13, 1989 <br /> <br />e. Hours required to complete work <br />144,600 cy = 362 hrs. <br />400 cy/hr <br />D9H costs $77.66/hr. <br /> <br />362 hrs. x $77.66/hr <br />Smooth Grading <br />Included in previous smooth grading costs. <br />Topsoiling <br />Included in previous topsoiling costs. <br />Revegetation <br />Included in previous revegetation costs. <br />Total Road and Surface Facility Area Reclamation Cost <br />_ $ 28,100 <br />= S 45,600 <br />e <br />Facility Removal Costs <br />It is estimated that the cost for removing the surface <br />facilities at the mine site will be approximately two times that <br />calculated to remove the tipple facilities. Based upon equipment <br />costs, these costs have inflated approximately 168. <br />Tipple Facility Removal Cost = 521,600* x 1.16 = $ 25,100 <br />Mine Facility Removal Cost = $25,100 x 2 = $ 50,200 <br />*From Kerr Tipple Amendment Application [Page 99(a)1 <br />Rough Grading - Shop Area <br />The rough grading required to reshape the shop area will <br />15 <br />