Laserfiche WebLink
Revised June 13, 1984 <br />is <br />,, ~ <br />2. 1.0 ft. x 1.5 acres/pond x 93,560 cu. ft./acre <br /> 27 cu. ft./cy <br /> = 2,420 cy of topsoil to replace at each pond <br />3. Average haul distance = 3,000 ft. <br />4. Cat 657 produces 312 cy/hr (80B efficiency, 6B RR, 08 grade), <br /> adjusted for altitude = 312 x .90 5 = 282 cy/hr <br />5. 2420 cy of topsoil is replaced at each pond <br /> 242 0 = 8.6 hrs/pond <br /> 282 <br />6. Cat 657 costs $178.54/hr <br />7. 8.6 hrs/ pond x 6 ponds x 5178.54 = $ 9,200 <br />Revegetation Costs <br />1. 1.5 acres/pond (under embankment) x 6 ponds = 9 acres <br />2. Impoundment Areas: <br />Pond A 5.44 acres <br />Pond B 3.25 acres <br />Pond C 0.58 acres <br />Pond D 5.23 acres <br />Pond E 4.78 acres <br />Pond F 1.25 acres <br />~~ <br />Total <br />3. TOTAL area to be revegetated <br />4. Revegetation cost <br />Total $827 x 29.53 <br />TOTAL Pond Reclamation Cost <br />= 20.53 acres <br />= 29.53 acres <br />_ $827.00/acre <br />_ $ 24,400 <br />= 5191,100 <br />13 <br />